Pebblevale Ltd
* *
Pebblevale Ceramic Machinary  
Navigation >> Welcome Reconditioning Projects Products News Contact
*
* *
*
PROJECTS : VILLEROY & BOCH back to project page *

*

 
 
 
Back to project page

Drying

REFERENCE
DESCRIPTION  
PVPP 0021 1 x CDS GAS FIRED TUNNEL DRYER AND HANDLING SYSTEM comprising of:-

64 M long x 7.5 M wide x 3.4 M high, 8 lanes ( 4 wide x 2 high) capable of drying 600,000 pieces of Stuck on rim WC's per year.
Full Details
*
PVPP 0022 CDS 2 channel Tank/Lid Ware Truck Tunnel Dryer Full Details
*
PVPP 0023 PCL Dryer loading , unloading and finishing conveyor Full Details
*